Skip to main content

Review links

When the part of a spec that another spec relies on changes, the link between them is marked as needing review (Links and pins explains why). This page says how to handle those marks.

Who can confirm: project reviewers and admins, or the owner of the source spec if they are a contributor or above. The credential needs the scope decide:link.

Open Needs Review in the project's sidebar, or Review all N links on the Overview page. The screen groups by what changed, so you read the change of one target spec once and answer for every link pointing at it. Two tabs:

  • Links: the strong links, grouped by target spec.
  • Scope pins: the rules that apply to many specs, grouped by the rule that changed.

Each group shows the target spec, the version range (for example v2 → v3), the criteria that changed, the number of links, and the first few links. The Mine only chip keeps only what belongs to specs you own.

Step by step:

  1. Click View change to see the target's differences right on the screen, without leaving the list.
  2. Select single rows or a whole group.
  3. If the change has no effect, click No impact on N. This is a confirmation you answer for; it adds a record and creates no version.
  4. If you made a mistake, click Undo to get the flag back.

Two cases have no No impact button: a removed criterion ("target removed") and a retired target spec ("target retired"). Only a change request that changes or removes the link can resolve them.

On each spec's page, the Relations tab also has a No impact button on each link that needs review.

With the CLI​

tmspec link review # groups of links needing review, grouped by target spec
tmspec link review c9 # every link pointing to PAY-C-9
tmspec link review --mine # only your specs
tmspec diff c9@2..3 # read the change before deciding
tmspec link confirm c9@3 # No impact for the links pointing to PAY-C-9, at version 3 which you have seen
tmspec link undo c9 # take it back if you confirmed by mistake

link confirm requires the version of the target spec that you have seen (c9@3). The CLI confirms only when the part the link points to did not change between that version and the newest one, so nobody confirms a change they have not seen; if the target spec changes again, the command stops with code 6 and you look at the new change. --source <ref> limits it to a few source specs, --note records the reason. The command always sends in a batch, even for one link.

For rules that apply to many specs, use the twin set of commands:

tmspec pin review # changed rules, grouped by rule
tmspec pin list c9 # every spec in the scope of PAY-C-9
tmspec pin confirm c9@3 # No impact for the whole scope
tmspec pin undo c9

tmspec link list r12 lists every link of a spec, with the pin state of each.

Tips​

  • Read the change before clicking. "No impact" is what you tell the team: that you have looked.
  • When the change really requires your spec to change too, do not confirm; propose a change for the source spec.
  • Weak links (relates_to, mention) never raise flags.